The Ukrainian and Brazilian organisations delivering the Cyclone 4 programme.

The Cyclone 4 project is delivered by a programme network of Ukrainian and Brazilian organisations, with more than 100 Ukrainian entities taking part.

Ukraine

State Space Agency of Ukraine

Competent authority of Ukraine responsible for implementation of the long term cooperation on utilization of the Cyclone 4 launch vehicle at the Alcantara Launch Center.

Yuzhnoye

Responsible for designing the Cyclone 4 launch vehicle and its ground support equipment, and for integration of spacecraft with launch vehicles.

Yuzhmash

Responsible for preparation of the industrial base and manufacturing of the Cyclone 4 launch vehicle and ground support equipment elements.

Hartron

Responsible for development of the Cyclone 4 guidance, navigation and control system.

Dniprovazhmash

Responsible for development of the dry run testing range in Dnipropetrovsk and manufacturing of ground support equipment elements.

CDI

The Central Design Institute of the Ministry of Defense of Ukraine is responsible for designing the Cyclone 4 launch site facilities at the Alcantara Launch Center.

Elkor

Responsible for development and installation of ground electric supply and automation systems for the Cyclone 4 launch site.

Other Ukrainian participants include Arsenal, Kyivprylad, NIIRI, Azovzagalmash, KhZTO, Hydromax, Anteks Automatika and Concord Group.

Brazil

Brazilian Space Agency

Competent authority of Brazil responsible for implementation of the long term cooperation on utilization of the Cyclone 4 launch vehicle at the Alcantara Launch Center, and responsible for development of the general infrastructure for the Cyclone 4 launches.

MCTI

The Ministry of Science, Technology and Innovation of Brazil is the parent ministry of the Brazilian Space Agency.

Camargo Correa and Odebrecht

Perform construction and engineering works for the Cyclone 4 launch site development.