The current events in Ukraine have not impacted the Cyclone-4 Project development. Currently, the Launch Vehicle development is progressing as scheduled, and it will be ready for delivery to Alcantara in the second half of 2015. A significant portion of the Launch Site civil construction activities has been completed as well. Most of Ground Support Equipment has been contracted, and some has already been received in Alcantara.
Below are some pictures showing the current situation:
Launch Vehicle
First two stages
Upper stage main engine, structural test
First stage main engines, electropneumatic tests
Second stage main engines, electropneumatic tests
First stage thrusters
Second stage thrusters
Upper stage reaction control system
Upper stage propellant bay testing
2/3 interstage compartment, static test
Payload fairing, separation test
Strap-down inertial navigation system
Control system element
Launch Site
Launch Complex
Launch Complex
Processing Complex
Processing Complex
Processing Complex
Ground Support Equipment
Neutralization system
Checkout equipment for control and navigation systems
Compressed gas feeding system
An element of the launch vehicle fueling system
An element of the launch site power supply system
Launch site power supply system
Gas control system
Launch site hardware elements: